OnlQQker

Extension and Stuff.wmv

Phase 3 will be more interesting. This whole job including Kitchen with boiling water kettle tap, bathroom, patio, doors, windows, blocks concrete etc etc etc came in just shy of 10k. It really is not what you know but who you know regarding materials.
The music builds with a bit of bass , beats listening to wind on mike "outside", mini JCB and whacker.
Almost expected a plop on end as 20ps get dropped in well !
Job looks done. Thanks for sharing the build "TheOnlooker"
 
Last edited:
Top Bottom