A
Reaction score
1

Profile posts Latest activity Postings About

  • I’m sure this has been covered a squillion times before but advice please. EICR on block of 5 flats all with separate supplies & meters. One boiler serving hot water via one system to all flats. Main bond to water and gas on entry to building. There is no bonding locally within the flats themselves. If main bond on entry is in place for a shared water / heating system I was thinking C3 for no local bond within flats
    EICR
    MICC supplying shed socket.
    Buried in concrete but visible in many places along its length.
    MI non insulated.
    I say C2 but electrician I discussed this with thinks C3.
    Anyone else?
  • Loading…
  • Loading…
  • Loading…

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock