    Possible fault in PV generation meter after system installed 2 years.

    Hi All, I read through all threads and can't seem to find this topic so apologies if I've missed one where is has been discussed. Got a phone call from a customer today saying that when they went to submit their annual ROCs reading from their generation meter, it was only showing 34 units. The...
  2. M

    Washing machine installed in electrical riser

    Hi Guys Can anyone let me know who I can contact to discuss this installation? I work for a company in laundry industry. We (not me but our install team - most clever ladies in the office and bunch of subcontractors) installed washer in the riser. I escalated this issue 3 months ago during...
  3. S

    Help with commercial PV install

    I have installed several domestic 3 and 4kW PV systems over the last five or six years and a few 10KW systems but i dont have experience with larger commercial installs. I have now been asked by a previous customer to provide an estimate to install a 30kW system on his factory. He has already...
  4. D

    SWA Installed inside Shot Blasting Booth

    We've got a shot blasting booth with a steel working platform inside, bolted to this platform are 4 x LED floodlights (mounted inside a steel enclosure with tempered glass door). They are wired up with SWA cable which is clipped to the underside of the platform. Is there any regulations...
  5. T

    SELV Outdoor Recessed Brick Lights

    I have a customer who wants two brick lights installing in a wall either side of his electric gates. The Electric gate installer has installed flex from the control box to roughly where the lights would go, part of which is buried. Obviously I'm not comfortable about sending 240v down this...
  6. C

    double pole switch on a bathroom selv fan

    Just bought a xpelair 12v humidistat 100mm fan to go in zone 1 and reading instructions it asks for a d/p switch. Is that the regs ? I assumed it could be wired as normal i.e. live from light switch and perm live etc .. having looked into it a bit more it seems i could go 230 v if rcd protected...
  7. D

    Another "exporting PME post"...

    I have a situation whereby a new build property has had a green electrical cabinet installed at its boundary, and a new 3ph PME supply installed. There is a 4c 25mm SWA from here to the detached garage, which will house the plant room (3ph ground source heat pump, 3ph PV inverter), and then...
  8. T

    Power Keeps Cutting Out After New Fuse Box Installed

    Hello everyone and thanks in advance for any advice. I hope this is an appropriate place to post this thread. I live in a council flat and had a new bathroom fitted some months ago. A new fuse box was installed at the same time. Ever since we have had problems with the power cutting out...
  9. yellowvanman

    Inverter on earth stake?

    Been asked to replace an old consumer unit, PV installed so bonding etc up to scratch. House supply is TNCS, however with the PV wiring the inverter (Fronius) is on its own earth stake! So that makes 2 earthing systems in close proximity! Why would they want to earth stake the inverter?
  10. Stuart Houghton

    Export Limitation

    I received a call from a person who was not a customer of mine asking to connect up his 8 kW PV system. Its a new build and the modules were installed when the scaffolding was up, this was several months ago. System is 2 x ABB PVI 3.6-TL-OUTD inverters connected to 32 x 250 watt modules. The...
  11. plodder1

    Hi People, I am new to the forum and I am looking for price advice.

    We have a convenience store and are having a new suspended ceiling installed but we are also having 16 light fittings installed. I believe the wiring is okay and I think we will be going for LED fittings. I just wondered if anyone can advise on the price roughly just so I have an idea.
  12. L

    Reference Methods??

    Hi there, I was just looking to find out what would be the most appropriate reference method to use. the distribution circuits leave the fuse board in 3 meters of trunking, then onto basket most of the ciruicts at lower lever then come down the wall in conduit which has been pre installed in...
  13. N

    Does a Rewire of Bathroom Have to Have Extractor Fan Installed for Regs?

    Hello, I recently had house re-wired which included bathroom. While the wiring for an extractor fan / isolation switch for one has been installed no actual extractor fan has been. I was wondering whether this is required to for the Electrician to sign-off/for regulations? (My builder...
  14. Marvo

    Come up and camp at my place for a few days...he says

    Yeah, a buddy of mine sold his house and bought himself a few hundred hectares in the middle of nowhere about 6 months ago. I haven't heard a peep out of him for 6 months then out of the blue he's Captain Hospitable. Come for a ride up on your bike he says, spend a few days he says, don't worry...
  15. G

    Load and heat

    Hello. New to this forum stuff so hopefully this makes sense. I've recently installed a 10mm 3core cable (H07FN-R) to power a 12kw electric boiler. On full power the boiler is drawing 46Amps. I'm a bit concerned as the cable is omitting a slight heat when drawing this load, was just wondering if...
  16. D

    Cable tray

    Hi guys Could someone please tell me what distance apart the threaded rod supports should be on a 150mm tray. Thanks
  17. Stuart Houghton

    PV Plus / PV+ - any good?

    Not sure myself ! PV Plus (PV+) Grid Voltage Optimiser Monitor Unit (Fully Installed) | The Renewable Energy Hub - https://www.renewableenergyhub.co.uk/product/pv-plus-grid-voltage-optimiser-monitor-unit-fully-installed.html PV Plus (PV+) Voltage Solar Panel System Generation Optimiser...
  18. T

    Wires under no floorboards ?

    How would you approach laying in ring downstairs with no floorboards or joists just bare ground, the property is being refurbished ? Bit puzzled by this one !
  19. Worcester

    Another one bites the dust ... And Another..

    AS the Queen song goes. Just got another call - system installed by a now non-trading concern, fried inverter, Samil in this case. The question is, what do you replace them with - Samil only had a 2 year warranty. Like for lIke? Something with a longer warranty? ABB / SMA ?
  20. Energetic

    VAT rating on batteries and off grid.

    Been out of the loop for a bit, am I right in assuming that batteries for a domestic self consumption situation are 5%? Also for off grid systems? Cheers E

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock