Hi, now everything is SPD's I've been told they need to be on their own MCB.
So incoming line goes through the main switch then busbar then MCB and into the SPD, SPD neutral joins into the incoming top of the main switch, and earth attaches to the CPC busbar. I think.
What stops the MCB...