hi all, not been on here for a while as the twins are taking up all my spare time at the moment
been asked to fit some flood lights to the top of a building site hoarding which is 6 metres tall.
they want feed and loops in swa to adaptable boxes and blue arctic from boxes to lights.
dont seem right to me so would welcome any input from someone more knowledgable on this as to whether its acceptable within the regs??
cheers