cristiano
hello, I am doing the wiring in 8 flats and a comunal area.
i have 3 phase supply at the bottom and i am wondering if i can put the 3 phases into a 4 way DB first. then i am thinking to leave meter tails coming out of the trunking for each meter which will be installed.
is this something i can do or do i have to install that old box with cartrige fuses instead of the DB?
so, i have the main head, but the 9 meters are not there yet.
thanks
i have 3 phase supply at the bottom and i am wondering if i can put the 3 phases into a 4 way DB first. then i am thinking to leave meter tails coming out of the trunking for each meter which will be installed.
is this something i can do or do i have to install that old box with cartrige fuses instead of the DB?
so, i have the main head, but the 9 meters are not there yet.
thanks