As above really, Massive green house converted into small units.
Basic supply was single phase and when he asked for 3 phase this is what they ve done.
Basicly you ve got 2 phase and netural from one cable and a seperate earth, 2nd cable has 1 phase another CPC.
Its a private supply, All this is connected into a metal clad box.
I only noticed because i was getting a very high Ze reading and traced it back. There are 3 CPC's tagged down to said box.
Where i found a loose connection and got my Ze back down.
Any views commets etc etc This box is Pre meter by the way.
Basic supply was single phase and when he asked for 3 phase this is what they ve done.
Basicly you ve got 2 phase and netural from one cable and a seperate earth, 2nd cable has 1 phase another CPC.
Its a private supply, All this is connected into a metal clad box.
I only noticed because i was getting a very high Ze reading and traced it back. There are 3 CPC's tagged down to said box.
Where i found a loose connection and got my Ze back down.
Any views commets etc etc This box is Pre meter by the way.