We have them at work , buy the scafftag type label for test dates they tie wrap on and are very hard wearing
Give it an I d
Visual check , must have metal braiding if on construction site or engineering shop floor etc (type 7 cable) or sy which we like for portable equipment ( some people don’t like to use )
Continuity tests
Ins resistance
Fill out ppm sheet
Store in folder or on pc
Job done ✅
 
Also,check for correct configuration,as a lead with a male type plug at both ends,could pass inspection,in regard of how it is fitted.

Industrial sites are notorious,for "modified" leads,with the 110/240 16A "universal-with-the-nib-removed" being common :)

Just noticed where the OP is...gonna be a voltage drop,to there :)
 
Also,check for correct configuration,as a lead with a male type plug at both ends,could pass inspection,in regard of how it is fitted.

Industrial sites are notorious,for "modified" leads,with the 110/240 16A "universal-with-the-nib-removed" being common :)
That old chestnut
 
We have them at work , buy the scafftag type label for test dates they tie wrap on and are very hard wearing
Give it an I d
Visual check , must have metal braiding if on construction site or engineering shop floor etc (type 7 cable) or sy which we like for portable equipment ( some people don’t like to use )
Continuity tests
Ins resistance
Fill out ppm sheet
Store in folder or on pc
Job done ✅
As written in electricity at work act
Keep records of electrical equipment that may cause harm and keep in safe working condition
This is how we comply with national grid , united utilities etc
And we get audited on this to make sure we are complying
 
We have them at work , buy the scafftag type label for test dates they tie wrap on and are very hard wearing
Give it an I d
Visual check , must have metal braiding if on construction site or engineering shop floor etc (type 7 cable) or sy which we like for portable equipment ( some people don’t like to use )
Continuity tests
Ins resistance
Fill out ppm sheet
Store in folder or on pc
Job done ✅
The dislikers what do you suggest
 

Reply to 3 Phase Leads in the Electrical Testing & PAT Testing Forum area at ElectriciansForums.net

Similar Threads

G99 SGI-3 4.4 kw set export limit phase to neutral loop impedance test on site 0.309 ohms and dno max being 180 m ohms or 0.018 ohms so site...
Replies
11
Views
1K
Hi all, We have a limited in house PAT testing requirement and were advised that the TIS700 fitted our needs. The unit works fine for 110V and...
Replies
0
Views
626
hi guys / girls , any advice would be appreciated, So the situation is a domestic property has a 3 phase supply , from the service head we have 3...
Replies
1
Views
261
Hello, Looking for some advice following a botched 3 phase upgrade today. Some background: Commercial unit originally fitted out (4 years ago)...
Replies
7
Views
502
Hi I have UPS 50KVA and the inverter output AC voltage is feeding a distribution panel 120/208 V 4 wires when I check UPS display it shows me...
Replies
1
Views
236

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock