- Reaction score
- 538
Jez more acronyms than American terminologies.
I would of got a -------ing. I used to call “RFC’s” ring mains. “SFCU” Spurs.
Line was Live.
Just out of curiosity how much has the AM2 changed?
When I done it there was cable tray. Pyro and steel conduit to do. DOL starter for motor. Pyro for Fire alarm sounder. Pyro for motor feed. SWA feeding the D/B. Plus 2 way switching in Singles through trunking into the conduit we had to make up
I would of got a -------ing. I used to call “RFC’s” ring mains. “SFCU” Spurs.
Line was Live.
Just out of curiosity how much has the AM2 changed?
When I done it there was cable tray. Pyro and steel conduit to do. DOL starter for motor. Pyro for Fire alarm sounder. Pyro for motor feed. SWA feeding the D/B. Plus 2 way switching in Singles through trunking into the conduit we had to make up