S
solargenerator
I have a solar pv system whixh is 2 years old.
My setup is over two roofs east/south due to roof configuration.
3kw with aurora outd 3.6 using the twin mppt inputs. 13 x romag 235w. 9 x east, 4 x south with the 4 south paired up with to on the east to give give enough voltage for the twin mppt.
Installed before any type of power optimiser were readily available
Question is can i have my system altered with say the solaredge optimisers op (to use a solar edge inveretor) or opa (to keep my invertor) range without it affecting my FIT payments.
I am sure the optimisers will increase my yearly output due to he shading issues i have early morning, afternoon and the configuration of the panels to enable the use of the twin mppt.
Many thanks in advance. Andy.
My setup is over two roofs east/south due to roof configuration.
3kw with aurora outd 3.6 using the twin mppt inputs. 13 x romag 235w. 9 x east, 4 x south with the 4 south paired up with to on the east to give give enough voltage for the twin mppt.
Installed before any type of power optimiser were readily available
Question is can i have my system altered with say the solaredge optimisers op (to use a solar edge inveretor) or opa (to keep my invertor) range without it affecting my FIT payments.
I am sure the optimisers will increase my yearly output due to he shading issues i have early morning, afternoon and the configuration of the panels to enable the use of the twin mppt.
Many thanks in advance. Andy.