There are two floursecent lights in the gagage which seem to take a long time to come on. They are controlled by two way switches, one near the door from the kitchen and one near the large door at the front.
Can I change these to flood lights which should come on immediately one of the switches is operated.
The existing lights are attached to the wooden roof beams which support the
tiled roof.
Can I change these to flood lights which should come on immediately one of the switches is operated.
The existing lights are attached to the wooden roof beams which support the
tiled roof.