Got a customer who has 3 phase but only one connected. He's going to build a workshop to host 8kwp of pv and is going to re-connect another of the phases with a different meter.
Have I got this right, the first 4kwp can go back to the house, that should achieve a D rating, the second one will go back to the new workshop so that would need to be a D rating and he'd get the 4kwp Fit rate for each installation rather than the 8kwp rate? :dunce2:
I think I'm losing the will to live!
Have I got this right, the first 4kwp can go back to the house, that should achieve a D rating, the second one will go back to the new workshop so that would need to be a D rating and he'd get the 4kwp Fit rate for each installation rather than the 8kwp rate? :dunce2:
I think I'm losing the will to live!