J
JohnnyZS
I'm currently working on a rewire team, all domestic, I have the complete level 2, plus the 301 302 303 part of the level 3. The college I was at have said they don't think I'll be getting the scope of work required for the NVQ, some guys on other teams I've talked to have said they did exactly that. What qualifications can I try and get with housebashing? Its just the usual stuff like using pvc/pvc, sometimes flex cables, using capping and mini trunking. I know there's not a lot of range there but is there anything I can try and get with that? The college did say they will let a couple of the things for the logbook be done in their workshop as long as I can get most of the evidence at work.
Thanks
Thanks