S
Snapester
So i got to price a job, basically a garden centre wants an office in a summerhouse they only will have a few lights and power sockets! But when i arrive they have a length of 2.5mm T&E Ducted over 100m!! I try to tell them that they need to uprate it as the VD will be pretty high over that length which could cause overheating etc... But when i tell them the cost to run an armoured to supply the shed and lighting they require they decide they will stick with the 2.5mm! DIY JOB!! meh.......... Sorry just venting! :evil: