T
Test Probes
I know on a 3 phase supply system ie; a DB, you measure PFC & PFCC taking the highest of the two reading and doubling it. This is then recorded. But what about say a 3 phase motor for example where you measure each Line and record it on the schedule of test results. Is the result recorded as is or do we have to double it?