Hi all,
Holiday village, brick built lodges circa 1960s. Supply is 35mm 4 core armoured, each phase and n comes in to Henley blocks and out to next unit, armour in/out terminated onto metal plate that also has a connection for earth to local consumer unit in each bungalow/cabin. 1 phase used in each unit into a sub meter (unit owner pays the site owner for electric used) then up to CU. No access to where the supply comes from.
So I am calling it TNS… views?
The Ze is 1.08 ohms ZeDB is 1.04 (previously Ze 0.51 on 2017 eicr) ... I notify the owner, but not DNO as surely it is a sub main, so site owners responsibility?
am I missing something?? Surely should be less than 0.8 ohms and the change is of concern anyway… what would you do? thanks all.
Holiday village, brick built lodges circa 1960s. Supply is 35mm 4 core armoured, each phase and n comes in to Henley blocks and out to next unit, armour in/out terminated onto metal plate that also has a connection for earth to local consumer unit in each bungalow/cabin. 1 phase used in each unit into a sub meter (unit owner pays the site owner for electric used) then up to CU. No access to where the supply comes from.
So I am calling it TNS… views?
The Ze is 1.08 ohms ZeDB is 1.04 (previously Ze 0.51 on 2017 eicr) ... I notify the owner, but not DNO as surely it is a sub main, so site owners responsibility?
am I missing something?? Surely should be less than 0.8 ohms and the change is of concern anyway… what would you do? thanks all.