Hi all, I have been asked to perform an EICR on a 7 floor office IT based company, each floor approximately 2,500square feet and three phase supply. Looks reasonably new office so doubt there will be many extras in remedial, I'm guessing they have some expensive IT kit and they may need an EICR to make sure they are not running any risk of damaging it, so it will have to be a thorough EICR. Work has to be completed at the weekend and it's central London! Any idea on what the going rate is?
 
High!

It is impossible to say without having seen the layout of the power structure within the building but there can be a lot of problems (time) tracing circuits initially and switching off IT equipment (and making sure there is none connected on IR testing) can be a nightmare.

You will need to see if they have full as built or current building plans (and check them).
I would also get written confirmation of the agreement to switch items off and when you can do this. Have a principle contact with whom you can arrange denergisation.
Also worth asking why they need an EICR, just in case there are already problems.
 
As its the weekend you could look at 150% or 200% of your usual rate per circuit.

It would be best to get them to unplug everything and when you do an IR test do it on 100v DC first to make sure there is nothing plugged in - this will show up everything plugged in and should not damage anything plugged in as its below the supply voltage - again worth double checking if anything is sensitive to 100v DC (should not be on a 415v AC supply (3-Phase)).
 

Reply to EICR 7 floor offices in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

Similar Threads

Before I pay an electrician to come check my work, I thought it worth a post here. I don't want to pay the cost of a small car for a whole-house...
Replies
0
Views
1K
Sorry for a bit of a long question. For what it's worth this is Scotland. I have been asked to quote a very large job in an old commercial...
Replies
24
Views
3K
Outage of main three phase primary switch box for one of three buildings on commercial site. The building houses around 30 commercial units...
Replies
15
Views
3K
I went to quote for remedial work in a flat yesterday. The client is selling the flat and wants an EICR for the purposes of the sale. The last...
Replies
23
Views
3K
I have a three phase supply in my house in Azerbaijan. The incoming cable from the meter is 4x35mm SWA with a 120A DNO breaker, CU is a Schneider...
Replies
1
Views
2K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock