We have recently installed a P.V. Solar installation at a premises where the energy supplier is not registered for F.I.T. payments. The client is applying to another supplier (eg. British Gas, Swalec) to deal with the feed in tariff via the F.I.T. meter.
At the moment, to register the installation, we have connected the tails from the F.I.T. meter into the mains terminal blocks. The F.I.T. meter is registering and the generation from the panels is being fed through the present supplier system.
Can anyone explain who is losing or gaining at the moment?
Thanks
At the moment, to register the installation, we have connected the tails from the F.I.T. meter into the mains terminal blocks. The F.I.T. meter is registering and the generation from the panels is being fed through the present supplier system.
Can anyone explain who is losing or gaining at the moment?