P
pmosely
Now - up to about ten min's ago - i thought I had this install sussed- I'm a bit tired so I may just be misunderstanding some of the posts on this forum - I've also been out of the electrical game for about twenty years and just r*********** so need some support please - hence me checking and double checking the forums.
I am to provide a supply to a pond (pump and filter). I was going to run a 1.5mm SWA cable spur from an FCU from the existing RCD protected ring final circuit - as per diagram on Appendix 15 page 362. Its about mid point of the ring and the run from the ring (fused spur) to the multi-way fuse box in the garden is about 8 meters. Some of the posts suggest there is a limit of 3m? Ref: page 74 of regs (433.2.2)? To me this refers to where the actual protective device can be located no further than 3m from the csa reduction and you cant have anything spurred off this 3m bit of cable - I'm tapping direct off the ring anyhow and not from a socket! Please advise if what I'm planning is ok - thanks all
I am to provide a supply to a pond (pump and filter). I was going to run a 1.5mm SWA cable spur from an FCU from the existing RCD protected ring final circuit - as per diagram on Appendix 15 page 362. Its about mid point of the ring and the run from the ring (fused spur) to the multi-way fuse box in the garden is about 8 meters. Some of the posts suggest there is a limit of 3m? Ref: page 74 of regs (433.2.2)? To me this refers to where the actual protective device can be located no further than 3m from the csa reduction and you cant have anything spurred off this 3m bit of cable - I'm tapping direct off the ring anyhow and not from a socket! Please advise if what I'm planning is ok - thanks all