Hi All,
I would like advice with regards to documenting an Installation.
Its basically in a mansion which has a plant room (basement), GF, 1st Floor 2nd Floor.
Each floor Has a DB and either 1 0r 2 Lutron Panels all of which are fed individually from the Main panel for the property in the basement. My question is should each board DB & Lutron panels have their own front sheet/ tick sheet, or should I only have a front / tick sheet for the Main Panel combined with schedule of test results of the other boards in the premisis. Sorry if it sounds basic but I would like to document in the most appropriate manner.
Many Thanks
LH
I would like advice with regards to documenting an Installation.
Its basically in a mansion which has a plant room (basement), GF, 1st Floor 2nd Floor.
Each floor Has a DB and either 1 0r 2 Lutron Panels all of which are fed individually from the Main panel for the property in the basement. My question is should each board DB & Lutron panels have their own front sheet/ tick sheet, or should I only have a front / tick sheet for the Main Panel combined with schedule of test results of the other boards in the premisis. Sorry if it sounds basic but I would like to document in the most appropriate manner.
Many Thanks
LH