Hi,
I know there have been many threads on this previously, but I am having a problem understanding ome of the detail.
The situation is this, I am not a qualified electrician but have dabbled around the house for many years, although doing only very basic stuff as I know my limitations.
An eldery relative has asked me to instal some electrics in her shed, but I have declined saying there are too many rules and regulations these days and she is better to get somebody qualified.
She has agreed to this but was nervous about being ripped off so asked me to be present when the spark came around to do a quote.
The guy turned up and advised he would run 4mm T&E in plastic conduit from the main consumer unit out to the shed (about 10m run by my estimation) and would then fit a 2 position garage type consumer unit, with a 16a MCB for the two double sockets she wants, and a 6A for the single eletric light (60w bulb).
The guy did not specify how he would wire up the two sockets, nor anything about earthing ect.
He quote a price of £350 which seemed very steep considering its probably less than a days work, but otherwise what he suggested seemd to be what I was expecting.
Anyway, she mentioned the job to a friend of a friend who is a spark for the local Housing Authority. He came around and he said, there was no need to go to all that trouble and that she could either simply run an extension lead into the shed and use that, or if she wanted permanent wiring, it could be run as a fused spur off a ring main in the house and the lighting circuit teed off it as another spur in the shed. I asked about it needing an RCD, and he said it wouldn't be needed as the ringmain is fed via an RCD in the main consumer unit.
I know that both ways will work, but I am not sure if the second way is legal/ "with in regs" so to speak?
BTW, the second guy is not offering to do the work, but suggesting we get the original spark to quote for a simpler therefore cheaper job? Running the cabling tyhis way will reduce the cable run to about 5m..
I will add the shed is wooden so there should be no special earthing issues, plus, the two double sockets will only be used to run a fridge, tumble drier and lawn mower, so no excessive current draw..
Regards,
Peter
I know there have been many threads on this previously, but I am having a problem understanding ome of the detail.
The situation is this, I am not a qualified electrician but have dabbled around the house for many years, although doing only very basic stuff as I know my limitations.
An eldery relative has asked me to instal some electrics in her shed, but I have declined saying there are too many rules and regulations these days and she is better to get somebody qualified.
She has agreed to this but was nervous about being ripped off so asked me to be present when the spark came around to do a quote.
The guy turned up and advised he would run 4mm T&E in plastic conduit from the main consumer unit out to the shed (about 10m run by my estimation) and would then fit a 2 position garage type consumer unit, with a 16a MCB for the two double sockets she wants, and a 6A for the single eletric light (60w bulb).
The guy did not specify how he would wire up the two sockets, nor anything about earthing ect.
He quote a price of £350 which seemed very steep considering its probably less than a days work, but otherwise what he suggested seemd to be what I was expecting.
Anyway, she mentioned the job to a friend of a friend who is a spark for the local Housing Authority. He came around and he said, there was no need to go to all that trouble and that she could either simply run an extension lead into the shed and use that, or if she wanted permanent wiring, it could be run as a fused spur off a ring main in the house and the lighting circuit teed off it as another spur in the shed. I asked about it needing an RCD, and he said it wouldn't be needed as the ringmain is fed via an RCD in the main consumer unit.
I know that both ways will work, but I am not sure if the second way is legal/ "with in regs" so to speak?
BTW, the second guy is not offering to do the work, but suggesting we get the original spark to quote for a simpler therefore cheaper job? Running the cabling tyhis way will reduce the cable run to about 5m..
I will add the shed is wooden so there should be no special earthing issues, plus, the two double sockets will only be used to run a fridge, tumble drier and lawn mower, so no excessive current draw..
Regards,
Peter