sorry if this has been covered but I cannot find answers -
1st floor flat TNS supply from basement - the water is bonded at the stop cock within the flat to the consumer unit .
The Gas enters in 2 places for cooker and boiler . Some "brightspark" has earthed this via a rod at the meter - does the bonding need to go back to the MET in basement or is to the C/Unit ok ?
1st floor flat TNS supply from basement - the water is bonded at the stop cock within the flat to the consumer unit .
The Gas enters in 2 places for cooker and boiler . Some "brightspark" has earthed this via a rod at the meter - does the bonding need to go back to the MET in basement or is to the C/Unit ok ?