I am planning to create a 6 bedroom HMO , to be leased to the local council (Short term lets). Their surveyor has said that each room needs to have its own consumer unit. ie Only one room will trip if there is fault

Has anybody got experience of this or done this ? I have asked a electrician and he said it is not required or unachievable to have 6 CU's and 1 for communal area's.
 
I am planning to create a 6 bedroom HMO , to be leased to the local council (Short term lets). Their surveyor has said that each room needs to have its own consumer unit. ie Only one room will trip if there is fault

Has anybody got experience of this or done this ? I have asked a electrician and he said it is not required or unachievable to have 6 CU's and 1 for communal area's.
I am planning to create a 6 bedroom HMO , to be leased to the local council (Short term lets). Their surveyor has said that each room needs to have its own consumer unit. ie Only one room will trip if there is fault

Has anybody got experience of this or done this ? I have asked a electrician and he said it is not required or unachievable to have 6 CU's and 1 for communal area's.
Small Garage CU in each room lighting and power, fed from a communal CU which would also feed F/As and Smokes, communal lighting and power from the same CU, no mention of how you will provide H.W and C.H, so can't advise on that side of the project, maybe more information required, oh forgot the kitchen requirement.
 
Most HMOs that I have worked on or inspected are extremely basic.
most don’t even have an emergency light nor fire alarm System.
a very common job I get asked to do is hard wire mains smokes in local HMOs
 
Most HMOs that I have worked on or inspected are extremely basic.
most don’t even have an emergency light nor fire alarm System.
a very common job I get asked to do is hard wire mains smokes in local HMOs
not been designed properly ehen and done on the cheap, no slur on your expertise intended by the way.
 
Small Garage CU in each room lighting and power, fed from a communal CU which would also feed F/As and Smokes, communal lighting and power from the same CU, no mention of how you will provide H.W and C.H, so can't advise on that side of the project, maybe more information required, oh forgot the kitchen requirement.
Thx

In the HMO their will be 1 Kitchen with 2 hobs, extractor, Microwave and for dble sockets. The heating/HW will be via combi boiler. There will be emergency lighting and a Grade A LD1 Fire Alarm
 
Thx

In the HMO their will be 1 Kitchen with 2 hobs, extractor, Microwave and for dble sockets. The heating/HW will be via combi boiler. There will be emergency lighting and a Grade A LD1 Fire Alarm
Thx

In the HMO their will be 1 Kitchen with 2 hobs, extractor, Microwave and for dble sockets. The heating/HW will be via combi boiler. There will be emergency lighting and a Grade A LD1 Fire Alarm
Will pm you if you want me to design this for you.
 
It will be the first HMO i know of that has its own con unit in each bedroom, and i have seen a few. Do they each get their own boiler for heat?
No the House owner will need to se a rate for heating, agreed in the tenant agreement, exactly the reason I suggested a prepayment metere in each room for Fan heaters, hair dryers etc. I have only ever been invoved in 1 and it's simple to see that individual C/H is just simply impossible to even think of.
 
See quite a few hmos intended for student accomodation. LA requirements quite strict in terms of fire and em lighting, fridge freezer volume, worktop area etc. Many of the larger ones have 2 hobs and 2 or 3 ovens and fridge freezers..
Never heard of a requirement for individual cu in each room. Unless supplies to these cus were fused as opposed to being fed via a b32 mcb for example, no real benefit?
 
If its a 6 bedroom hmo then should 2x14 circuit straight boards after 1 main switch not suffice with a breakdown something similar to this.

8x lighting circuits
8x socket circuits
4x cooking circuits
4x washing circuits
1x Heating circuit
1x Fire alarm circuit
1x intercom circuit
 
It is achievable to have consumer units in each room. However, you may well require an AFDD and possible SPD costing hundreds for each consumer unit. For this reason it would be better to have one central consumer unit supplying each flat with possibly a din rail meter for each flat. For instance one landlord I recently did some conversion work for had a bill for £6000 electricity. The tenants were wont to leave heaters on and disappear off to sunnier climbs for a few months. At least you could switch off the supply from a central location if needs be if you can't enter the room. Tenants can be most interesting in the way they treat property and equipment. It may therefore be safer to have the consumer units in a central location.
 
If the Local Council, who will be leasing the HMO have stipulated each room must have it's own C.U, then each room must have it's C.U. or go find someone else to lease it to.
Any discussion about alternative ways of doing it is pointless.

It doesn't matter whether it's unusual or over the top or if other extra work needs to be done as a result.
If the Council wanted 2 rooms painted Blue, 2 Pink and 2 neutral colour, then that's what they'd need to be.

If the first electrician has said it's not required or unachievable to have 6 CU's and 1 for communal area's, then the O.P will have to find one that can achieve it.
 
Last edited:

Reply to HMO Room Wiring in the UK Electrical Forum area at ElectriciansForums.net

Similar Threads

What are peoples opinion's on this, pair of big old semi-detached houses (85 and 87) converted into apartments, dont think its a HMO although it...
Replies
1
Views
236
We have a room in the house that was the kitchen. That has been relocated to a different area, so the old kitchen has been sold off and the room...
Replies
2
Views
614
Hi Pretty new here, so not sure if this question goes into this thread I am not an electrician; however, I plan to integrate IOT devices and...
Replies
8
Views
1K
Please advise what I should test / check next. My usual qualified electrician who did all of the work here is in Ireland for 4 weeks and not...
Replies
45
Views
3K
I need your help please once again in tracing a fault. Am DIY but not clueless. Converting former kitchen into 2 rooms: bathroom and laundry. The...
Replies
24
Views
2K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Electrical Forum

Welcome to the Electrical Forum at ElectriciansForums.net. The friendliest electrical forum online. General electrical questions and answers can be found in the electrical forum.
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock