- Reaction score
- 51
First fixed X6 new double sockets in garage the other day (didn’t have sockets to 2nd fix) now it’s TT system, now the board I’m working on is fed from a bigger garage 2.5mm SWA 16A RCBO, the board where I have first fixed the sockets has a Main switch and MCB for lights and sockets,
Would it be best to swap RCBO for MCB to feed the board I’m working on and just RCBO for lights and RCBO for sockets, im sure the Main Switch/RCD for the site is 300mA upfront so all good there.
Thanks
Would it be best to swap RCBO for MCB to feed the board I’m working on and just RCBO for lights and RCBO for sockets, im sure the Main Switch/RCD for the site is 300mA upfront so all good there.
Thanks