I need someone to enlighten me about Earthing and Bonding.

We've just completed the construction of four Fabricated Steel Bay Structures with a total of 354 Stansions 102 Beams, all connected to the Porlins, the place is to be used to seat 120,000 persons.

I am not in doubt of the importance of Earthing and Bonding to prevent shocks when there's leakage.
But i am told that the 354 Stansions must be bonded together to prevent shocks if leakage occurs.

My question is why must all the Stansion be bond together, when the whole structure, Stansions and Beam up to the Porlins are tied to each other.

Why don't we stagger the earthing and bonding to a reduced number of Stansions.
Thank you.
Kingsley
DIY Forum
 
Bulk Workwear - Clothing Suppliers for the Whole Forum Network
This official sponsor may provide discounts for members

Megawatt

-
Arms
Advent Win
I need someone to enlighten me about Earthing and Bonding.

We've just completed the construction of four Fabricated Steel Bay Structures with a total of 354 Stansions 102 Beams, all connected to the Porlins, the place is to be used to seat 120,000 persons.

I am not in doubt of the importance of Earthing and Bonding to prevent shocks when there's leakage.
But i am told that the 354 Stansions must be bonded together to prevent shocks if leakage occurs.

My question is why must all the Stansion be bond together, when the whole structure, Stansions and Beam up to the Porlins are tied to each other.

Why don't we stagger the earthing and bonding to a reduced number of Stansions.
Thank you.
Kingsley
DIY Forum
Kingsley in theory when you look at the building and with the steel structure it’s already bonded together but they want you to take each stansions to earth but I know that’s a lot. That’s information you should have had when the job started then you could have installed grounding electrodes at each Stansion before they poured the concrete good luck
 
Test to see whether the steel structure requires bonding . If it is introducing an earth potential and requires bonding test whether each section requires linking .

Quite simple really .
 

davesparks

-
Mentor
Arms
Esteemed
Who has told you they need bonding I this way?
What exactly have they told you is required?

Generally the minimum that is required is a bond to the steel structure at one point. The combination of bolts holding the structure together and the lightning protection linking it all together is usually enough to ensure continuity


However many designers/engineers will specify more than a single bond, anything up to a buried bare conductor ring around the building connected to every stanchion.
 
Assuming this is in Nigeria then local/national rules may apply or the consultant/designer has specific reasons for this requirement.
 

Reply to I need someone to enlighten me about Earthing and Bonding. We've just completed the construction of four Fabricated Steel Bay Structures with a tota in the Electrical Forum area at ElectriciansForums.net

Aico 3000 Range
This official sponsor may provide discounts for members

Electrical Forum

Welcome to the Electrical Forum at ElectriciansForums.net. The friendliest electrical forum online. General electrical questions and answers can be found in the electrical forum.
CK Tools :) The professionals choice when it comes to Electrical Tools
This official sponsor may provide discounts for members
Top Bottom