- Reaction score
- 5,604
I am a bit unsure of what Amendment 1 is saying regarding EV charging points and PME.
I understand the existing 3 methods in section 722.411.4.1 regarding the use of PME and EV charging points but I am not sure what the additional methods are?
Is it now easier to use EV charging points with a PME system?
I understand the existing 3 methods in section 722.411.4.1 regarding the use of PME and EV charging points but I am not sure what the additional methods are?
Is it now easier to use EV charging points with a PME system?