wee_ron
HELP NEEDED....
Myself and another Spark were given a lighting drawing for a plantroom in a new build hospital that contains six separate circuits, emergency lights included in each circuit. The switches are two way and intermediates. There is four banks of two gang switches. My question: How will these switches be able to operate the six circuits? We asked the charge hand if he wanted us to use contactors but they are not in the spec. He has to get back to us tomorrow with an answer. Have the designers made a mistake? This may be easy enough resolved on here but it is baffling the pair of us (the other spark has over 20 years of experience)
Go easy on me please....still wet behind the ears.
Myself and another Spark were given a lighting drawing for a plantroom in a new build hospital that contains six separate circuits, emergency lights included in each circuit. The switches are two way and intermediates. There is four banks of two gang switches. My question: How will these switches be able to operate the six circuits? We asked the charge hand if he wanted us to use contactors but they are not in the spec. He has to get back to us tomorrow with an answer. Have the designers made a mistake? This may be easy enough resolved on here but it is baffling the pair of us (the other spark has over 20 years of experience)
Go easy on me please....still wet behind the ears.