cudaboy, i agree it gets harder as you get older, just signed up for my 17th edition at the age of 49, got to do it so im in the know for my next niceic assessment, installation of all sorts is no problem at my age ive done all types, but those technical questions at assessment bother me, so hopefully i will be able to answer questions more easily afterwards, then im gonna do me testing course !!!!!
regards dave
 
mark couldnt agree with you more, i still enjoy my work couldnt think of doing anything better.(how sad is that)
 
dont get me wrong, i love what i do too {wife says my job easy as i just play with wires...} guess just frustrating! they be legislating garages next or somthing else dumb, ironically i used to do periodics years ago when employed,now i have to pay up to £1000 to get 2391 so can do it again.....but gotta save first! thanks for advice all, lifted my spirits, cheers and man hugs!!!;););););)
 
yeh i used to do periodics, but did you know that periodics do not come under part p legislation, so we can still do them but not under part p, but most insurers want niceic or alternative so doing our own certs may not be good enough.

anyway who wants to test others peoples crappy work ?
 
Last edited by a moderator:
my thoughts are this, im nominating one of my two jobs as a c.u change i did about 6 months ago<no labc involvment...oops>or should i say funk em, been doing this 20 yrs! if nic man says "hmmm paperwork labc"? i cannot backtrack,i cannot involve labc as already started job without consent! yeh yeh i know....should have involved building control.... who can honestly say they have on every notifyable job theyve done??? might just phone niciec ,!
 
my thoughts are this, im nominating one of my two jobs as a c.u change i did about 6 months ago<no labc involvment...oops>or should i say funk em, been doing this 20 yrs! if nic man says "hmmm paperwork labc"? i cannot backtrack,i cannot involve labc as already started job without consent! yeh yeh i know....should have involved building control.... who can honestly say they have on every notifyable job theyve done??? might just phone niciec ,!

oh i have Nathan, each and every job

'cos rules is rules see, and who am i to try and break the system
 
cudaboy, i agree it gets harder as you get older, just signed up for my 17th edition at the age of 49, got to do it so im in the know for my next niceic assessment, installation of all sorts is no problem at my age ive done all types, but those technical questions at assessment bother me, so hopefully i will be able to answer questions more easily afterwards, then im gonna do me testing course !!!!!
regards dave


Age does not mean a thing I'm 51 and took 2382-10 and passed it and got a 100% in the exam.:p
 
eh? age eh?? missing the point i think??? do nic want labc paperwork for assesment or not is the question! ta all. look im not a chancer but you telling me 1 week before the "part p" came in you were happy doing your business {for as long as you have been trading, 5,10, 20yrs}then one week into it you stopped working "because it was breaking the rules??? mmmmmmmmm. im only being honest,shoot me down if you want!!!
 
Last edited by a moderator:
cool man, i didnt know that! cheers.

going to involve labc on the jobs i submit nic man may / may not want to see labc involvment,.....just in case.well they gotta have their pound of flesh as well now! ere goes £500
 
Last edited by a moderator:
I rang up the Council thinking I needed them to inspect my CU change at my parents house before the niceic came round, an got told it would cost me (a soul trader) £260!!!! I then rang up the niceic informing them I'd changed the board and the council want £260 to come and test it, on top of the £450 i've already paid the niceic. Bit of a catch 22 money spinner I thought. The woman on the phone went back and forth and came back and told me that after my assessment, assuming everythin goes ok, I can notify the job via them. OK they are gonna charge me a late notification fee but its better than £260. The only thing I can assume is that they are more interested in testing you than the Council. My assessment is on the 12-11-08, fingers crossed all goes well. Any tips on things I should brush up on would be a great help guys. Not too sure how deep they're gonna look into the installation, I mean, am I responsible for the whole installation????? ie. unclipped cables and Loose JB's in the loft???
 
I had my assessment on Friday and it all went swimmingly. The assessor was keen to point out that he's not trying to catch you out, he's there to help. We started with my minor piece of work, a new outside socket, then moved to the major work, a new ring final.

Both passed his inspection without any problems but he did give some hints and tips of alternative methods of installation. He wasn't criticising, just pointing out alternatives.

I had to do a couple of tests on the minor (Ze and IR) and a full set of tests on the major. With each test I had to explain exactly what I was doing, why, and what the results meant. We had quite a bit of discussion about the results and how to interpret them. All very relaxed but he was definitely making sure I knew what I was doing.

My concern about LABC notification didn't come up as I'm still within the time limit so can now notify via NIC.


Things I would suggest for anyone having their assessment...
  • If your work looks good, ie all cable runs truly vertical or horizontal and all accessories secure and properly installed, then that will give him confidence right from the start.
  • Make sure you've tested beforehand and all results comply with regs.
  • Make sure the certificates are complete and accurate.
  • Isolate properly when you start. I got the feeling this was a big one for him.
  • Know how to test and interpret the results. You'll have to do a full set of tests so make sure you know what you're doing.
  • Make sure you've got all the books and paperwork that they require. There's no point failing over something so easy to get right.
I think that's about it. Good luck to those waiting for assessments.
 
Seems very positive that the LABC fees can be avoided on jobs for assessment although I´m a bit confused.....

When installing a new cct I understood LABC had to be informed BEFORE the job was started AND then they would also inspect on job completion?

Assuming LABC were informed of the "assessed job" (being a fine upstanding, legal sparky!) from the very beginning how are the fees avoided? And what happens if you fail the assessment?
 
hi dixon
thats exactly how i see it, if its notifiable surely you have to inform labc before starting the work :confused:
i know that once registered there is a set period to register work once complete but surely any scheme provider would want to see all relevant paperwork for previous installations complete including labc involvement.
best to confirm with whichever scheme you choose prior to booking an assessment.
best of luck ;)
 
Hi there.

The labc route is for people who have no intention of registering with a scheme provider. its basically for one off jobs.
If your a Qualified spark awaiting assesment then the labc are fine with you doing the job for your assesment.

To get mine i installed a fused spur off a socket in my living room then changed my sisters consumer unit. 1 minor works 1 major works.
i certed them on the green certs the nic give you as part of your registation process. i dated the certs a week before my assesment.
Passed with flying colours, notified the jobs a week later when my details came through from the nic.

Hope this helps
 
Hi there.

The labc route is for people who have no intention of registering with a scheme provider. its basically for one off jobs.
If your a Qualified spark awaiting assesment then the labc are fine with you doing the job for your assesment.

To get mine i installed a fused spur off a socket in my living room then changed my sisters consumer unit. 1 minor works 1 major works.
i certed them on the green certs the nic give you as part of your registation process. i dated the certs a week before my assesment.
Passed with flying colours, notified the jobs a week later when my details came through from the nic.

Hope this helps

Sounds good to me but...

In the event that you hadn´t passed, what would have happened re LABC?
 
This was my main fear. If I'd failed my assessment then I would have had to a) apply for retrospective approval including the bill from LABC and their contractor, or b) swept it all under the carpet (You ain't seen me, roight).

For the avoidance of any doubt, b) was a joke by the way.
 
Hi there.

if your an electrician you will not 'fail'

Its not a test. Its showing some guy you know how to do your job.

my niceic assesor said in 4 years of doing the job he had never 'failed' anyone.

They state during your assesment that they are not there to catch you out, and you are free to use your onsite guide and regs to help answer any questions he asks you.

Hope this helps.
 
Hi there.

if your an electrician you will not 'fail'

Its not a test. Its showing some guy you know how to do your job.

my niceic assesor said in 4 years of doing the job he had never 'failed' anyone.

They state during your assesment that they are not there to catch you out, and you are free to use your onsite guide and regs to help answer any questions he asks you.

Hope this helps.


Sounds fair enough to me.
 

Reply to LABC and NIC First Assessment in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock