Advertisement - Content continues below
Advertisement - Content continues below

Discuss Long Lead Cheap Alternative Suggestion in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

D

daver

Welcome to ElectriciansForums.net - The American Electrical Advice Forum
Head straight to the main forums to chat by click here:  American Electrical Advice Forum

Just a general as to what people are using for long lead testing. Not made a purchase yet, but refuse to pay the £70 or £80 megger and Kewtech want to charge for a 30M roll of cable with some banana plugs on the end.

What is a cheaper alternative.

Got banana plugs and sockets, what would be a managable cable to use.

Cheers


Dave
 
Advertisement - Content continues below
K

kung

  • Thread Starter Thread Starter
  • #2
I just use a roll of 2.5 single and put it on a reelable drum like an old extention lead drum. couple of connectors and r2 tests are sorted cheap.remember to null out or subtract from test result.
Think there was a thread regarding this not long ago.
regards
Tony
 
Last edited by a moderator:
D

daver

  • Thread Starter Thread Starter
  • #3
That was my thinking, I was just looking for a more flexible cable. I know that the megger uses silicone multi strand, so very flexible. But trying to find that cheap is impossible. Did find some PVC multistrand 2.5 which is very flexible and around £15 but then need a reel. Just seeing what everyone else uses.
Cheers
 
K

kung

  • Thread Starter Thread Starter
  • #4
That was my thinking, I was just looking for a more flexible cable. I know that the megger uses silicone multi strand, so very flexible. But trying to find that cheap is impossible. Did find some PVC multistrand 2.5 which is very flexible and around £15 but then need a reel. Just seeing what everyone else uses.
Cheers
just a thought but could try maplin
 
D

daver

  • Thread Starter Thread Starter
  • #6
Thanks guys, much appreciated.

Dave
 
S

super spark

  • Thread Starter Thread Starter
  • #7
try this

WANDER LEAD / WANDERING LEAD ADAPTER SOCKET on eBay, also Parts Accessories, Test Measurement Equipment, Electrical Test Equipment, Business, Office Industrial (end time 14-Feb-09 07:32:35 GMT)

Basically it converts any extension cable into a wander lead. Cost is £9.99 plus postage. I used one for a while and as it worked fine, not quite as convenient as a Kewtech but not far off. And a hell of a lot cheaper.

Will
cheap as chips !!! wot a gud idea !!!
 
D

daver

  • Thread Starter Thread Starter
  • #8
Made one of the adapter sockets today.

Socket 95P. Banana Socket about 20P.

Bit of 4mm earth and Glue Gun

Total Cost £1.15

Cheaper than Chips
 
D

Dan924

  • Thread Starter Thread Starter
  • #9
Made one of the adapter sockets today.

Socket 95P. Banana Socket about 20P.

Bit of 4mm earth and Glue Gun

Total Cost £1.15

Cheaper than Chips
I like your line of thought
 
K

kung

  • Thread Starter Thread Starter
  • #10
Made one of the adapter sockets today.

Socket 95P. Banana Socket about 20P.

Bit of 4mm earth and Glue Gun

Total Cost £1.15

Cheaper than Chips
sounds great m8 id it prob tastes better than the chips round here !
 
M

micromic08

  • Thread Starter Thread Starter
  • #11
try this

WANDER LEAD / WANDERING LEAD ADAPTER SOCKET on eBay, also Parts Accessories, Test Measurement Equipment, Electrical Test Equipment, Business, Office Industrial (end time 14-Feb-09 07:32:35 GMT)

Basically it converts any extension cable into a wander lead. Cost is £9.99 plus postage. I used one for a while and as it worked fine, not quite as convenient as a Kewtech but not far off. And a hell of a lot cheaper.

Will
Bought one myself off ebay. It works great with my extention cable on drum.
 
Advertisement - Content continues below

Reply to Long Lead Cheap Alternative Suggestion in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

Aico Carbon Monoxide Detectors
This official sponsor may provide discounts for members
Advertisement - Content continues below
Top Bottom