I have got a refurb to rewire, the incoming water supply is in plastic pipe as is all pipework
in the premises run in walls and underfloor.Copper is only used to connect to radiators and taps
where they exit the wall or come up from floor boards.
I can therefore omit the main bonding as long as disconnection time is met!
Is there anything else i need to take into consideration and what about supplementary bonding in this situation????
Thanks for any assistance you give!!!!!!!
in the premises run in walls and underfloor.Copper is only used to connect to radiators and taps
where they exit the wall or come up from floor boards.
I can therefore omit the main bonding as long as disconnection time is met!
Is there anything else i need to take into consideration and what about supplementary bonding in this situation????