Hi all,
Been today to look at a potential install and was a little concerned when I looked at where the supply was to be taken from...
Okay here goes,
Three phase 100A incomer, direct with 25mm meter tails going to a 9 way Ryefield unit, from there, there are 5 x 100A supplies feeding 25mm armoureds going to some 150mmx150mm trunking some 15M away, these are glanded off into the trunking and then direct into the meters...
I have been asked to put a 25mm SWA made off into the Ryefield board and then it can be terminated by the LEB!!! - Surely this cant be the correct way of doing it...
How can it be legal to have a Ryefield board with spare useable ways before any form of metering?
Been today to look at a potential install and was a little concerned when I looked at where the supply was to be taken from...
Okay here goes,
Three phase 100A incomer, direct with 25mm meter tails going to a 9 way Ryefield unit, from there, there are 5 x 100A supplies feeding 25mm armoureds going to some 150mmx150mm trunking some 15M away, these are glanded off into the trunking and then direct into the meters...
I have been asked to put a 25mm SWA made off into the Ryefield board and then it can be terminated by the LEB!!! - Surely this cant be the correct way of doing it...
How can it be legal to have a Ryefield board with spare useable ways before any form of metering?