Discuss MW or EIC?........... in the UK Electrical Forum area at ElectriciansForums.net

D

Deleted member 9648

Wired two RCD sockets on a radial today next to a sub-DB in a large factory unit. The new circuit was connected to an existing redundant 20a MCB which had served a control item which I'd disconnected a while back. Now based on the possibly iffy logic that because the protective device was already in place I decided that I'd get away with a MW because I wasn't adding anything to the existing DB.
Truth is I just couldnt be assed to gather the plethora of information required for an EIC to be correctly filled in for such a p***yass job.
A MW seemed more than adequate...Preparing now for a right good telling off.
 
In his words New circuit :D
Yes must admit, missed that mention, just skimmed the post, thinking more about it I'm leaning more your way although it could be argued that because there is an existing CB I change my mind Westy, EIC, it has to be.
 
My view is that Westward is correct in that it's a new circuit and requires a eic if you go by the book.
But I'd probally do as Wirepuller did and issue a mwc for this job, the mcb was already in place and if it supplied a socket already there and you extended it to the 2 new sockets there'd be no discussion, a mwc would be issued.
 
In his words New circuit :D
My view is that Westward is correct in that it's a new circuit and requires a eic if you go by the book.
But I'd probally do as Wirepuller did and issue a mwc for this job, the mcb was already in place and if it supplied a socket already there and you extended it to the 2 new sockets there'd be no discussion, a mwc would be issued.
That was my first thought Andy it's got to be an EIC , a contentious issue.
 
When you think about it a MWC has more than adequate information to certify that this sort of job is safe and fit for purpose. Whereas an EIC would add an hour to the job, nonsense really.
 
Just do what most people do and write the results in pen on the wall adjacent to the DB.
You know ze 0.12 etc etc. :rolleyes:

Tho in all seriousness the trauma of trying to take a ze to a functioning installation just because a couple of sockets have been added.
 
Thanks for the input chaps, I think technically an EIC would be the correct thing. The MCB was in place, the previous circuit connected to it had been disconnected, but nevertheless I connected a new and completely different circuit to it.
But I suspect I'll be trying to justify a MW for this sort of thing more and more in the future. As Dave OCD says, the time and effort an EIC now involves is a sledgehammer to crack a nut for this sort of thing. It's really designed for major works or new installations. Whenever I'm faced with compiling an EIC I cant help thinking we need something intermediate between a MW and EIC, say for a maximum of 1 new circuit. I confess in the past I have extended or spurred from existing circuits just to avoid an EIC when compiling one would be a pain, such as in commercial/government premises where access to the required areas is nigh on impossible without a major faf.
 
In a perfect world you could easily get your hands on the most recent EICR and then copy all of the info over such as Ze and the tick boxes to your EIC. Then you'd only have to perform the same tests as you would with a minor works
 
In a perfect world you could easily get your hands on the most recent EICR and then copy all of the info over such as Ze and the tick boxes to your EIC. Then you'd only have to perform the same tests as you would with a minor works

Not sure I agree with that ..............I may consider this route IF I had done the EICR ......... but use somebody else's figures ........... no
 
I do plenty of small installs in a factory where I did an EICR in 2016. Plenty dis boards so I just do a zs at board in question and cert to suit.
Similar to WP, today used an swa, which used to feed a portacabin, for a small compressor in a new quick build...so it ticked the right boxes.
Trouble is, I don't want to start ticking another load of boxes, either....pain in the butt. :(
 
In a perfect world you could easily get your hands on the most recent EICR and then copy all of the info over such as Ze and the tick boxes to your EIC. Then you'd only have to perform the same tests as you would with a minor works
Thats assuming the eicr is worth the paper it is printed on and has not been done by a drive by cowboy in his bodge job van.
all well until you copy the results from such an eicr and they are made up when really the place is a death trap...
 
Another problem I find is with ind/com kitchen work, maybe in schools or shopping centres. They may be small jobs, such as gas cut out panel supplies. It's virtually impossible to get any supply info or access. In such cases it has to be a case of noting on the cert.
Imagine trying to get info or access at Manchester airport or Liverpool Echo arena. It's impossible....and, sometimes, your dealing with awkward sods who don't want to know.
 

Reply to MW or EIC?........... in the UK Electrical Forum area at ElectriciansForums.net

Similar Threads

Hello all, I've just been perusing the AM2/E/S threads on here. Thought you might like a bit of a review. If, like I did, you find yourself...
Replies
7
Views
2K
Hi all, first post, and it relates to quite a challenging installation. The short version is that I'm working through remedial work on a 75 page...
Replies
13
Views
6K
Hi all, yesterday i went to a property to do an EICR in preparation for a DB change next weekend. The existing DB has six circuits, cooker, 2 x...
Replies
9
Views
3K
V
Hey guys, i have started to do some inspecting and testing, i am finding it very interesting although the certification part is a little confusing...
Replies
26
Views
4K
B
Found myself in a bit of a predicament Carrying out a PIR in a factory Testing an existing ring circuit in an industrial distribution board...
Replies
17
Views
2K
brizospark
B

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Electrical Forum

Welcome to the Electrical Forum at ElectriciansForums.net. The friendliest electrical forum online. General electrical questions and answers can be found in the electrical forum.
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock