W
Discuss My cool new way to earth SY screen. Feel free to keep this one as a freebie... lol in the UK Electrical Forum area at ElectriciansForums.net
at £17 each.... I think my ingenuity not only proves a cost effective and time efficient method of terminating screening but also shows when faced WITHOUT the *prefered* gland on a job there are nice tidy quick alternatives.
Don't poo on my party
I am INSTANTLY regretting posting this. lol :wheelchair:
If i was to use your method of incorporating the braid and CPC, at least i would use a stuffing gland into the enclosure!! What on earth are those things your using in the background entering the enclosure?? Look like some sort of PVC gland for plastic flexible conduit??
And yes, this arrangement would need some form of sleeving or heat shrink covering...
View attachment 19418View attachment 19419 Pluck the other cores from the center of the braid, leave the earth in, strip insulation from end of earth, twist together with SY screen and boot lace ferrule together. Perfecto. Less than 5 minutes work and a lovely neat job IMO.
Reply to My cool new way to earth SY screen. Feel free to keep this one as a freebie... lol in the UK Electrical Forum area at ElectriciansForums.net
We get it, advertisements are annoying!
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.