G
glasgow225
Guys just realised this Forum exists and looking for bit of support . Just passed C G's Part P , 17th Edition and Inspection and Testing recently and now have my NAPIT assessment two weeks today hence writing this message at daft o clock as nerves really starting to kick in already .
1.Is there anybody out there recently undergone an assessment that can give me any top tips for my half day assessment ?
2.One of my jobs that I am doing is 2fluorescents tube lights in loft and currently got total mental block about where to wire switch ? Is it direct into fluorescent and if so where is the connection and how do loop in to the other fitting or should I use the central joint box method ? Fantastic training in passing exams but doesn't buy experience or time on the tools eh ?
1.Is there anybody out there recently undergone an assessment that can give me any top tips for my half day assessment ?
2.One of my jobs that I am doing is 2fluorescents tube lights in loft and currently got total mental block about where to wire switch ? Is it direct into fluorescent and if so where is the connection and how do loop in to the other fitting or should I use the central joint box method ? Fantastic training in passing exams but doesn't buy experience or time on the tools eh ?