Richard3009
As an approved electrician
I have been in touch with niceic regarding setting up on my own, they require me to inform them of two pieces of work to inspect one minor one major, I assume for the major as im not certified I will have to inform building control of the major, or will niceic cover this job after the inspection
Its a bit of a chicken and egg scenario, what time scale do you have between completion of the installation and informing either niceic or building control.
Its all a bit of a minefield to me