I am currently carrying out a periodic test and inspection at a meat factory, the state of the installation is appalling i have found hundreds of faults ranging from damged sockects to undersized cables including a 2.5mm flex on a 250A MCCB
Obviously the installation is unsatisfactory, i would like to what the law says with regards to remdials is there a set time limit that the customer has to rectify the faults i have always thought it was three months but i would like to know for sure so i can quote the relevant reg.
Also what would the correct proceedure be if the company did not carry out the required works, the site in my opinion is immidately dangerous and staff and visitors are at risk however the company do not seem intrested in carrying out the work.
Also in the event that the company carry out the work themselves or employ another contractor to do it is it common practice to charge to return and retest the circuit that have failed.
I look forward to your thoughts Many thanks
Antony73993
Obviously the installation is unsatisfactory, i would like to what the law says with regards to remdials is there a set time limit that the customer has to rectify the faults i have always thought it was three months but i would like to know for sure so i can quote the relevant reg.
Also what would the correct proceedure be if the company did not carry out the required works, the site in my opinion is immidately dangerous and staff and visitors are at risk however the company do not seem intrested in carrying out the work.
Also in the event that the company carry out the work themselves or employ another contractor to do it is it common practice to charge to return and retest the circuit that have failed.
I look forward to your thoughts Many thanks
Antony73993