calhalla
We have the go ahead from a customer to install a 9 kW installation on a commercial building roof in Northamptonshire.
The installation will be on a flat roof and the building is currently unoccupied.
Will we need planning permission and if so how long does this normally take?
In other words can we beat the 12th December deadline?