Hi all, long story short...
viewed cu upgrade job and realized non dno pme connection - ze showed 2.2
property just fully decorated and cleaned...as usual!
client has tenants moving in before pme can be done but has been ordered to dno
nightmare trying to install a rod for TT due to layout (apartment/house conversion) with concrete boundries
no rcd nor cross bonding etc and im pushed for time. all existing circuits proved ok.
would you consider board change and a basic "not your best looking installed rod" due to decor (clipped to skirting to downstairs and outside)?
just wanting to please my great client in meantime and get them out of the muck due to an admin error on this install
im really pushed to get this done and wanted to do it tomorrow as tenants move in sunday but im afraid to sign anything off unless i get it in writing from client that dno ordered for pme. a permanent TT isn't really a feasible option. full pir done already.
cheers in advance guys
viewed cu upgrade job and realized non dno pme connection - ze showed 2.2
property just fully decorated and cleaned...as usual!
client has tenants moving in before pme can be done but has been ordered to dno
nightmare trying to install a rod for TT due to layout (apartment/house conversion) with concrete boundries
no rcd nor cross bonding etc and im pushed for time. all existing circuits proved ok.
would you consider board change and a basic "not your best looking installed rod" due to decor (clipped to skirting to downstairs and outside)?
just wanting to please my great client in meantime and get them out of the muck due to an admin error on this install
im really pushed to get this done and wanted to do it tomorrow as tenants move in sunday but im afraid to sign anything off unless i get it in writing from client that dno ordered for pme. a permanent TT isn't really a feasible option. full pir done already.
cheers in advance guys