I have always worked for other people and have recently been asked by a builder to work direct for him. The job in question is a side single extension which is as follows:
Small shower room leading into a small utility leading into a larger living area.
Shower room is 4m long and 3m wide - four spot lights, 10mm T&E for shower feed, shower isolator, switches etc, extraction
Utility is the same size - four spot lights 3 x double sockets, extraction,
Living area 15m x 8m - nine spot lights, centre light, heat alarm, five double sockets, switches, heat alarm etc
Consumer unit is on the wall so very easy to access so nothing major to do there.
Two guys working, all first fix one and a half days.
What should I be charging for those works?
I have to do the second fix in a few weeks.
Any help would be massively appreciated.
I have always worked for other people and have recently been asked by a builder to work direct for him. The job in question is a side single extension which is as follows:
Small shower room leading into a small utility leading into a larger living area.
Shower room is 4m long and 3m wide - four spot lights, 10mm T&E for shower feed, shower isolator, switches etc, extraction
Utility is the same size - four spot lights 3 x double sockets, extraction,
Living area 15m x 8m - nine spot lights, centre light, heat alarm, five double sockets, switches, heat alarm etc
Consumer unit is on the wall so very easy to access so nothing major to do there.
Two guys working, all first fix one and a half days.
What should I be charging for those works?
I have to do the second fix in a few weeks.
Any help would be massively appreciated.