Discuss Question regarding neutral for Ring final Circuit. in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

N

nazoom

I am carrying out the continuity for a ring final test for a single phase TN-S system. When doing the end to end Neutral I don't get a reading!! What is wrong here and what Code does apply (Code 1-3)?

Many Thanks.
 
There is no disconnected neutral I checked.

However a) L-L is ok,
E-E is ok
but N-N no reading!!

What's wrong here? And what code is used for the Periodic inspection reporting?
 
If you get no reading then there IS a break in the ring somewhere. It's obvious....that's what the test is checking for.....if you don't believe your test results then why bother testing? The break in continuity doesn't have to be at an accessory....could be any number of things. Bit worrying if you are doing EICRs......
 
It is for my exam. I did it today and there is tomorrow. but I cant understand if there is no reading for N-N does that mean that the ring is discontinues and therefore code 2 is used? Or is it incorrect polarity?
 
exam eh..

info only then..:13:

Old cert's?
Any idea of number of sockets ?

Resistance readings of L and CPC rings?(or is that asking to much)
It callled experience sometimes too, check everywhere, twice....ask the owner/householder questions as to where to look for more sockets.

Then wait for the buzz when you finally find it!:54:25 years and I do "Die Hard" when I find the fault the last 4 sparks couldn't find!!
 
Reading some of the OP's threads over the last couple of days, Iam sure he said that the test rig has deliberate faults added for the candidates to code for.
 
I'm throwing away all my regs books...in fact time to make some money.Selling all regs books and onsites guides!!
This is much more fun asking questions and getting answers..Love it! :heart:
 
I think that we should adopt an "ask question back" to these type questions and until the OP answers there should be no more input in the thread!
 

Reply to Question regarding neutral for Ring final Circuit. in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

Similar Threads

Please advise what I should test / check next. My usual qualified electrician who did all of the work here is in Ireland for 4 weeks and not...
Replies
45
Views
3K
Hi All Happy new year to all! First post but long timer lurker, so thanks for all the previous help! Just wanted to clarify something I have...
Replies
7
Views
807
I'm practising EICRs on friendly locations as I'm still in training - technically done my 2391-52 but frankly need loads more practise. I've just...
Replies
11
Views
758
Hi all EICR today on a ground floor flat .. 1 issue .. At the consumer unit there was a 1mm core with its yellow (sleeved brown) in a 20A radial...
Replies
20
Views
2K
Hi, while carrying out an EICR at a farm cottage on Friday i came up against a problem early on. Whilst measuring the Ze the reading i obtained...
Replies
22
Views
2K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock