Hi,

Apart from feed-in tariffs on direct.gov.uk I couldn't find anymore official regulations regarding medium size (100kW) PV installation. What document(s) should I have been looking for such system ?

It's for a purpose of self-study, hopefully a preparation for future employment ;)

Thanks,
Tom
 

Worcester

-
Mentor
Arms
Go to the Ofgem site and look for the ROO-Fit process.
 
B

bTom

  • Thread Starter Thread Starter
  • #4
I give you a "Thanks" even thus your answer is ridiculous, perhaps you are just attention seeker so have your five minutes.
 

BruceB

-
Arms
Looks like a helpful answer from Worcester to me.
Half way down this page:
Applying for the Feed-in Tariff
 
B

bTom

  • Thread Starter Thread Starter
  • #7
It is a good answer from Worcester because it's the thing I'm looking for.

I was talking more about babba, perhaps it's maybe only me but If would answer questions I would definitely provide a more accurate and detailed answer rather than simple "google" which is an obvious trolling.

Regarding the requirements for installation I've found another document:
http://www.bre.co.uk/filelibrary/pdf/rpts/Guide_to_the_installation_of_PV_systems_2nd_Edition.pdf
 