jamminuk
Hi,
We're re-wiring a flat that currently has a split load board with an off peak section for some convector heaters and 2 storage heaters. The off peak has its own meter that is radio controlled. We need to rewire the board and put the off peak into a separate board via a henley block, just wondered if this was just a case of taking the off peak supply into the new board and wire the rest as per usual, just wasn't sure how the meter situation worked?
Thanks
Ben
We're re-wiring a flat that currently has a split load board with an off peak section for some convector heaters and 2 storage heaters. The off peak has its own meter that is radio controlled. We need to rewire the board and put the off peak into a separate board via a henley block, just wondered if this was just a case of taking the off peak supply into the new board and wire the rest as per usual, just wasn't sure how the meter situation worked?
Thanks
Ben