- Reaction score
- 88
Yesterday was working below a mansard roof and to avoid drilling through steels I ran some 1mm cable along the top of the joists in the ceiling void created by the mansard. however, i was running the cable perpendicular to the joists which were 400mm apart. Is this mechanical support or not? is this allowed?