Hi guys - newbie here.

I have been installing since april and have some questions re TL's that I will post in separate threads. Sorry if topics are already covered but I cannot find definitive answers.

I am looking to install the SB4000TL for its 2 trackers. I spoke to the DNO yesterday, they advised that strictly speaking there should be a G83 application as it is not capped at 16A. I'm aware that these are commonly installed model, and would like to ask if anyone makes the application for them?

Thanks - itty
 
No - but im led to believe its Stage 2 - some DNO will accept if its been capped via the installers code from SMA -

Swap to power-one for duel MPP and 16A cap -
 
Ask the Dno to email the form to you and explain the figures etc or read the threads on this forum to give you a better idea, they are quite simple to do really we install a lot of 4000TL's and always make the application and have only had one rejected
The Dno engineer said we could only fit a 2.1kw system to which we explained that this was ridiculous by their rules when we can install a >3.68 system without previously applying, still not heard back from him yet!
 
I wonder where this puts you. If you've already applied and they have said 'no', can you go ahead and do a >3.68kWp system and inform them afterwards. I reckon the rules are on your side.
 
Ask the Dno to email the form to you and explain the figures etc or read the threads on this forum to give you a better idea, they are quite simple to do really we install a lot of 4000TL's and always make the application and have only had one rejected
The Dno engineer said we could only fit a 2.1kw system to which we explained that this was ridiculous by their rules when we can install a >3.68 system without previously applying, still not heard back from him yet!

When speaking to the DNO about it, I got the impression that the ones they would have problems with are the ones where there are a few installs already on the same street.

He did say that a lot of installers were not applying and were getting approved because the generator couldn't push more than 16A. But he said that if those installs started to give problems they would be decommissioned.

No problems with applying apart from the suggested 45 day wait. Think I'll take dansk's advice and consider power one. Come up against them a few times on quotes now and seem efficient at a reasonable price.

Thanks - itty
 
So far not had problems with Scottish Power, normally submit stage 2 application and have a verbal yes to proceed. Each DNO seems to be different, best thing is pick up the phone and ask nicely....
 

Reply to SB4000TL G83 Application? in the Solar PV Forum | Solar Panels Forum area at ElectriciansForums.net

Similar Threads

I'm not an electrician, just a householder (though do work in an area given a kick in the family jewels by government decision last year). I am...
Replies
12
Views
3K
T
Guys, can I ask you all to reply to this thread with details for each DNO that you have had dealings with and their approach regarding the G83...
Replies
61
Views
19K
officerdibble
O

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock