thwaitpd
I have had a look at a job to supply a garage (converted to an office) with multiple sockets (3 2gang) for 2 computers a phone and printer and 4 58w tubes. At the moment all of this and a tumble drier is all supplied from a spur off a spur on 2.5mm T&E(I know this is a big no no!!).
The CU is slap bang in the middle of the house and without ripping a floor up or having SWA exposed I cannot see that it is possible to get a feed from it.
My question is if a spur is taken off the main ring into and RCD and 32A MCB supplying the garage with 3 core 6mm SWA (the cable run would only be 9m) into a 2 way CU splitting it to the lighting and socket circuits in the garage. Is this feasible?
Thanks Paul
The CU is slap bang in the middle of the house and without ripping a floor up or having SWA exposed I cannot see that it is possible to get a feed from it.
My question is if a spur is taken off the main ring into and RCD and 32A MCB supplying the garage with 3 core 6mm SWA (the cable run would only be 9m) into a 2 way CU splitting it to the lighting and socket circuits in the garage. Is this feasible?
Thanks Paul