hi guys
ive been offered a job testing a static caravan site, well there more like log lodges tbh, anyway ive never done anyting like this before and could do with some advice.
ive had a quick look at the site and it looks like 10 lodges are fed from a main unit outside each on there own 32a mcb to a rcd unit under the lodge, then from there to a mains board in the lodge looks to be in artic cable, havent been inside one yet to check.
so my plan was to do a pir on each lodge but when i come to test the ze and pfc where would i take it from?
the rcd unit under the lodge or the main unit that supplies the 10 lodges?
bit confused on this one
thanks
ive been offered a job testing a static caravan site, well there more like log lodges tbh, anyway ive never done anyting like this before and could do with some advice.
ive had a quick look at the site and it looks like 10 lodges are fed from a main unit outside each on there own 32a mcb to a rcd unit under the lodge, then from there to a mains board in the lodge looks to be in artic cable, havent been inside one yet to check.
so my plan was to do a pir on each lodge but when i come to test the ze and pfc where would i take it from?
the rcd unit under the lodge or the main unit that supplies the 10 lodges?
bit confused on this one
thanks