thoughts on this one folks....
6mm armoured cable to supply summerhouse. Wiska box screwed onto side of the house at a low level beside vents - this allows a pathway under floor to front door hatch where fuse board is.
Option 1 - terminate the armoured cable into the wiska box on side of house. Join with 6mm twin and earth inside box with crimps or terminals.
Option 2 - use the wiska box to feed the cable through under the floor. Join the cable nearer the hatch to allow crossover to twin and Earth.
Note 1 - wiksa box was added to outside wall for neatness. Rather than having an ugly hole with cable running through it.
Note 2 - want to avoid terminating the armour into the board for a few reasons (ease/ access/ space etc)
6mm armoured cable to supply summerhouse. Wiska box screwed onto side of the house at a low level beside vents - this allows a pathway under floor to front door hatch where fuse board is.
Option 1 - terminate the armoured cable into the wiska box on side of house. Join with 6mm twin and earth inside box with crimps or terminals.
Option 2 - use the wiska box to feed the cable through under the floor. Join the cable nearer the hatch to allow crossover to twin and Earth.
Note 1 - wiksa box was added to outside wall for neatness. Rather than having an ugly hole with cable running through it.
Note 2 - want to avoid terminating the armour into the board for a few reasons (ease/ access/ space etc)