just carried out and EICR on a grubby flat.
One defect was lack of bonding in the bathroom without RCD protection.
I don't want to change the DB to RCD everything.
everything is wired in conduit, would I be correct in saying all I need to do is link a 4mm bond from the conduit to all the associated extraneous conductive pipes.
I think this because mech CPC has been used throughout.
Finally I can't get into the origin as the LL can't get access.
I personally have always been able to access the origin before so how would you go about it?