Hello all,
Ths is my first post and I would appeciate any advice on a new job I have started.
I have an initial installation of 12 new build flats over 4 floors on a site in Plymouth. This is new to me as I have only ever done houses before.
The incoming 3 phase supply is a 95mm 4 core wavecon main terminating in a 18 way J type Ryefield Board, the main will terminate in 200 amp cut out and the board will have 3 banks ( phases) with 6 x 80 amp fuses on each.
I am running 16mm SWA from a ground floor meter cupboard to each flat. The meters will remain in the cupboard.
Can anyone please suggest the best setup to terminate and connect x12 three core SWAs to isolators and meters.
If anyone knows of a similar build I can take a look at, that would be great.
Thanks.
Ths is my first post and I would appeciate any advice on a new job I have started.
I have an initial installation of 12 new build flats over 4 floors on a site in Plymouth. This is new to me as I have only ever done houses before.
The incoming 3 phase supply is a 95mm 4 core wavecon main terminating in a 18 way J type Ryefield Board, the main will terminate in 200 amp cut out and the board will have 3 banks ( phases) with 6 x 80 amp fuses on each.
I am running 16mm SWA from a ground floor meter cupboard to each flat. The meters will remain in the cupboard.
Can anyone please suggest the best setup to terminate and connect x12 three core SWAs to isolators and meters.
If anyone knows of a similar build I can take a look at, that would be great.
Thanks.