Just abit of advice needed please.
Off to do a job next week on a TT system the Ze was 463Ohms so I plan to install a new rod and main earth cable, But I know it's going to be a pain to get it low enough. If there any rules on having a link from my new rod to the old one?
Thanks
Off to do a job next week on a TT system the Ze was 463Ohms so I plan to install a new rod and main earth cable, But I know it's going to be a pain to get it low enough. If there any rules on having a link from my new rod to the old one?
Thanks